PRESS RELEASE – 6/18/2026 – Dynamic Preconstruction Services Awarded Independent Cost Estimating Contract by Truckee Meadows Water Authority
June 18th, 2026
Dynamic Preconstruction Services has been selected to support Truckee Meadows Water Authority with Independent Cost Estimating (ICE) Services for their OneWater Nevada Advanced Purified Water Facility at America Flat CMAR.
The $200 million facility is Nevada’s first water purification and reuse project, bringing a reliable, local water supply to the Truckee Meadows region. As a major advancement in the water industry, the facility will use drought-resistant technology designed to lower operational costs and energy requirements while meeting federal drinking water standards through granular activated carbon filtration and ultraviolet light treatment.
Dynamic will bring cost clarity and transparency through expert estimating insight and technical knowledge that drives informed project decisions and helps advance the future of water infrastructure in this region. Being part of progressive projects that are on the leading edge of the construction industry and benefit communities and the people in them is what makes us Dynamic.
Jesse Espinoza, Dynamic Founder / Principal Consultant, shares, “This contract is a blessing from God and a reflection of the core values that guide Dynamic; our work ethic, integrity, reliability, and continuous improvement. For this opportunity, our team worked closely with Truckee Meadows Water Authority to align the scope with the needs of the project while staying true to the level of service and integrity the work deserves. We are proud to have earned their trust, and we are confident in our ability to deliver the insight, transparency, and technical expertise needed to support the project’s success.”
Let’s be Dynamic!
